Tomorrow I will be ready for commissioning my printer. I have one big question: in the BigBox Printer main assemblies, in chapter 13 (Frame Top assembly), the first thing you do is finger-tighten the four screws (two on the X-Axis Idler & two on the X-Axis Motor Mount) clamping the X-Axis bearings. During Commissioning I nowhere can find where they are fastened again. It would make sense that this should be done after chapter 1.2 in Commissioning, after the positioning of the X-axis to the front of the frame. Am I right about this ?